Wurdong BESS Artists Impression

Artists Impression

The artist’s impression provides a visualisation of how the BESS could look. The image is indicative only and is subject to change.


Project Timeline

  • Timeline item 1 - complete

    Development - Site Selection

    During this phase, potential sites for the Battery Energy Storage System (BESS) are identified and evaluated based on criteria such as proximity to existing electrical infrastructure, environmental impact, land use, and community acceptance. Once the optimal site is chosen, this milestone is marked as complete.

  • Timeline item 2 - complete

    Development - Feasibility

    In this phase, a detailed assessment is conducted to determine the technical, economic, and environmental viability of the project. This includes analysing energy needs, grid connection possibilities, financial modeling, and risk analysis. Upon confirming that the project is feasible, the milestone is considered complete.

  • Timeline item 3 - complete

    Development - Planning & Approvals

    This phase involves preparing and submitting planning applications to relevant authorities. It includes community consultation, environmental impact assessments, and seeking approval from local councils and other regulatory bodies. Once the necessary approvals are secured, this milestone is complete.

  • Timeline item 4 - active

    Development - Post DA Lodgement

    After the Development Application (DA) is lodged, this phase focuses on responding to any feedback or conditions set by the authorities. The project team ensures all requirements are met and finalises preparations for the delivery phase. Completion occurs when the DA is successfully processed.

  • Timeline item 5 - incomplete

    Delivery - Pre-Construction

    In this current phase, the project team prepares for the start of construction. This includes finalising designs, securing contractors, and arranging logistics. The transition to actual construction is carefully planned, and the project is now on track for physical implementation.

  • Timeline item 6 - incomplete

    Delivery - Construction

    This phase will involve the physical building of the BESS, including site preparation, installation of equipment, and connection to the grid. Safety, quality control, and timelines are crucial. This milestone will be reached once the BESS is fully built.

  • Timeline item 7 - incomplete

    Operational

    After construction, the BESS will become operational, providing energy storage and discharge as required by the grid or local energy needs. Monitoring and maintenance are ongoing to ensure efficiency and safety. This milestone will be reached once the BESS is fully operational.

  • Timeline item 8 - incomplete

    Decomissioning

    At the end of the BESS's operational life, this phase involves safely dismantling and removing the equipment, restoring the site, and responsibly disposing of materials. This ensures minimal environmental impact and compliance with regulatory standards.


Akaysha is proposing to deploy a large-scale BESS near Wurdong Heights in the Gladstone Region in QLD, with a capacity of between 400MW/1600MWh. Akaysha is consulting with the community, completing environmental surveys for planning approval and proceeding with the connection process.


We have plans to build the new BESS at 89 Hughes Road, Wurdong Heights, adjacent to the existing substation. The project will include:

  • Installation of battery units, inverters, cooling systems, and other equipment
  • Connection to local electrical grids
  • A 275 kV HV substation and transmission line connecting to Wurdong Substation

The BESS will support the state of Queensland’s network and a transition to clean energy.



Previous & Upcoming Engagement Sessions

Wednesday 24 July 2024 03:00 pm to 06:00 pm

Community Drop In Session

Location: Benaraby Progress Association Hall, 48845 Bruce Hwy, Benaraby QLD 4680

Thursday 25 July 2024 08:00 am to 12:00 pm

Community Drop In Session

Location: Benaraby Progress Association Hall, 48845 Bruce Hwy, Benaraby QLD 4680


Map of Wurdong Substation



We’d love to hear from you


Community Small Grants Application

Apply now for the Community Small Grants Program! We support local projects and initiatives that make a difference.