Mobilong BESS Artist Impression

Artists Impression

The artist’s impression provides a visualisation of how the BESS could look. The image is indicative only and is subject to change.


Project Timeline

  • Timeline item 1 - complete

    Development - Site Selection

    During this phase, potential sites for the Battery Energy Storage System (BESS) are identified and evaluated based on criteria such as proximity to existing electrical infrastructure, environmental impact, land use, and community acceptance. Once the optimal site is chosen, this milestone is marked as complete.

  • Timeline item 2 - complete

    Development - Feasibility

    In this phase, a detailed assessment is conducted to determine the technical, economic, and environmental viability of the project. This includes analysing energy needs, grid connection possibilities, financial modeling, and risk analysis. Upon confirming that the project is feasible, the milestone is considered complete.

  • Timeline item 3 - complete

    Development - Planning & Approvals

    This phase involves preparing and submitting planning applications to relevant authorities. It includes community consultation, environmental impact assessments, and seeking approval from local councils and other regulatory bodies.

  • Timeline item 4 - active

    Development - Post DA Lodgement

    After the Development Application (DA) is lodged, this phase focuses on responding to any feedback or conditions set by the authorities. The project team ensures all requirements are met and finalises preparations for the delivery phase. Completion occurs when the DA is successfully processed.

  • Timeline item 5 - incomplete

    Delivery - Pre-Construction

    In this current phase, the project team prepares for the start of construction. This includes finalizing designs, securing contractors, and arranging logistics. The transition to actual construction is carefully planned, and the project is now on track for physical implementation.

  • Timeline item 6 - incomplete

    Delivery - Construction

    This phase will involve the physical building of the BESS, including site preparation, installation of equipment, and connection to the grid. Safety, quality control, and timelines are crucial. This milestone will be reached once the BESS is fully built.

  • Timeline item 7 - incomplete

    Operational

    After construction, the BESS will become operational, providing energy storage and discharge as required by the grid or local energy needs. Monitoring and maintenance are ongoing to ensure efficiency and safety. This milestone will be reached once the BESS is fully operational.

  • Timeline item 8 - incomplete

    Decomissioning

    At the end of the BESS's operational life, this phase involves safely dismantling and removing the equipment, restoring the site, and responsibly disposing of materials. This ensures minimal environmental impact and compliance with regulatory standards.

The BESS will occupy an area of 3.5 hectares within the proposed site and is approximately 5km north of Murray Bridge within rural land adjacent to the SAPN Mobilong substation.

The BESS will have a capacity of 200MW and provide up to 4 hours or 800MWh of energy storage, delivered using class-leading battery technology.

Planning Consent Approval

The Mobilong Battery Project has been granted planning consent (Application ID 23010120) by the SA Planning Authority.


Map of Mobilong Substation