Project Timeline

  • Timeline item 1 - complete

    Development - Site Selection

    During this phase, potential sites for the Battery Energy Storage System (BESS) are identified and evaluated based on criteria such as proximity to existing electrical infrastructure, environmental impact, land use, and community acceptance. Once the optimal site is chosen, this milestone is marked as complete.

  • Timeline item 2 - active

    Development - Feasibility

    In this phase, a detailed assessment is conducted to determine the technical, economic, and environmental viability of the project. This includes analysing energy needs, grid connection possibilities, financial modeling, and risk analysis. Upon confirming that the project is feasible, the milestone is considered complete.

  • Timeline item 3 - incomplete

    Development - Planning & Approvals

    This phase involves preparing and submitting planning applications to relevant authorities. It includes community consultation, environmental impact assessments, and seeking approval from local councils and other regulatory bodies.

  • Timeline item 4 - incomplete

    Delivery - Pre-Construction

    In this current phase, the project team prepares for the start of construction. This includes finalising designs, securing contractors, and arranging logistics. The transition to actual construction is carefully planned, and the project is now on track for physical implementation.

  • Timeline item 5 - incomplete

    Delivery - Construction

    This phase will involve the physical building of the BESS, including site preparation, installation of equipment, and connection to the grid. Safety, quality control, and timelines are crucial. This milestone will be reached once the BESS is fully built.

  • Timeline item 6 - incomplete

    Operational

    After construction, the BESS will become operational, providing energy storage and discharge as required by the grid or local energy needs. Monitoring and maintenance are ongoing to ensure efficiency and safety. This milestone will be reached once the BESS is fully operational.

  • Timeline item 7 - incomplete

    Decomissioning

    At the end of the BESS's operational life, this phase involves safely dismantling and removing the equipment, restoring the site, and responsibly disposing of materials. This ensures minimal environmental impact and compliance with regulatory standards.


Akaysha Energy is developing the Glenrowan Battery Energy Storage System (BESS) in collaboration with BZ Renewables. The BESS will have a capacity of 400MW/1600MWh and will connect into the existing Glenrowan Terminal Station. It will provide grid stability services, storing energy from nearby electricity generation projects and the grid, and discharging energy to the grid during times of peak demand. In doing this, it will provide for more reliable, affordable and cleaner electricity.

The BESS will occupy an area of 10 hectares, approximately nine kilometres south west of Glenrowan and five kilometres north east of Winton, within the Rural City of Benalla. The site is surrounded by established solar farms and gently undulating hills, preventing views from the Hume Freeway. As part of the planning process, several technical assessments are underway, including a Fire and Bushfire Management Plan which will be written with input from the Country Fire Authority.

  • More reliable and affordable electricity
  • Providing storage for renewable energy generated by local solar farms
  • Co-located with other electrical infrastructure
  • Surrounded by solar farms and undulating hills obstructing views of the BESS
  • Positioned away from public viewpoints (including the Hume Freeway) and residences
  • Employment opportunities for local contractors during construction and operation
  • Providing grid services to improve the stability of the electricity grid

Previous & Upcoming Community Engagement Sessions

Saturday 15 March 2025 10:00 am to 02:00 pm

Community Engagement Session

Location: Clubhouse, Glenrowan Recreation Reserve - 5 Daniel Lane, Glenrowan

Concept Layout Plan

Concept Layout Plan

Community Context Plan

Community Context Plan

Frequently Asked Questions


Contact Us

Contact

In Writing

Akaysha Energy

Level 7, 22 Gordon Street

Cremorne, VIC

Call Us

1300 530 923